
2015 BaifaPower(Wuxi)’s new site with total floor areas of 40000 square meters and state-of-art production-manufacturing technology, it is scheduled to put into use during 2015. The new site is predicted to be one of the largest diesel generators manufacturing base in the China or around the world.